
- One team, one fixed price — no surprise variations
- Dedicated project manager on every job
- Typically 6–8 weeks from start to finished kitchen
- 10-year workmanship warranty

Cabinetry, stone, plumbing, electrical and paint — managed as a single fixed-price project by the team who designs it, builds it, and stands behind it.
Most kitchen companies stop at cabinetry, leaving you to separately coordinate a stone mason, plumber, electrician and painter. A Supreme Stone kitchen renovation is managed as one accountable project from the first design conversation through to the final walkthrough.
We design around how you actually use the space — storage, workflow, lighting and material choices are worked through together before a single cabinet is ordered — then our own trades carry the build through cabinetry, stone fabrication, plumbing, electrical and paint, so nothing falls through the gap between contractors.
Every renovation is quoted fixed-price after a free design consultation, with a dedicated project manager tracking the job from demolition to final walkthrough, and a 10-year workmanship warranty backing the finished result.

Fantastic to deal with — clear communication, amazing job, and lovely to have in the home. Highly recommend.Sarah Ellis-Kirifi, Verified Google Review
We visit your home, understand the brief and your budget, and talk through material and layout options.
A detailed, fixed-price proposal covering cabinetry, stone, plumbing, electrical and paint — no hidden variations.
Your stone is templated and fabricated in-house while our trades manage the renovation on-site.
A final inspection together, before we hand back a space finished to the standard we'd want in our own home.
Three fixed-price packages — Essential, Classic and Premium — each including cabinetry, stone and installation. See full package pricing and inclusions →
Most complete kitchen renovations — cabinetry, stone, plumbing, electrical and paint — take between 4 and 8 weeks from demolition to final walkthrough, depending on scope. We confirm an exact timeline in your fixed-price quote.
Yes. Every project is quoted as a fixed price after your design consultation and free measure, so there are no surprise variations once work begins.
We work across Auckland, Northland and the Waikato.
Tell us about your kitchen renovation and we'll be in touch within one business day.